4. Replace the existing mill in the duratone circuit with a new hammer mill system (SN23), which is also heated with a MMBtu/hr natural gasfired heater (SN22). Exhaust from the hammer mill will be ducted to a dust collector and then routed to the thermal oxidizer (SN16). 5. The wastewater ponds (SN14) will be closed and covered.